Dependency Graph
View Issue Details
ID | Project | Category | View Status | Date Submitted | Last Update |
---|---|---|---|---|---|
0000408 | SOGo | Web Calendar | public | 2010-02-05 16:24 | 2015-01-22 09:35 |
Reporter | Assigned To | ||||
Priority | normal | Severity | tweak | Reproducibility | have not tried |
Status | new | Resolution | open | ||
Target Version | 3.0.0 | ||||
Summary | 0000408: views: draw the day/week/month views with DOM methods to avoid a request | ||||
Description | When refreshing or changing the current view, the grid is refreshed from the server before the events are queried. When refreshing the same day, the grid should not be redrawn at all, when changing day or changing view, the drawing process should be done with DOM methods to avoid a double request to the server which is slower anyway. | ||||
Tags | No tags attached. | ||||
Proposed model:
Additionnaly, the deletion of an event would trigger the redraw of the view, as was done before. consequence:
|
|
Date Modified | Username | Field | Change |
---|---|---|---|
2010-02-05 16:24 |
|
New Issue | |
2010-02-13 18:33 |
|
Note Added: 0000547 | |
2010-11-04 13:30 |
|
Summary | avoid refreshing the daysview grid when not needed => views: draw the day/week/month views with DOM methods to avoid a request |
2010-11-04 13:30 |
|
Description Updated | |
2010-11-04 13:32 |
|
Relationship added | related to 0000950 |
2014-03-09 21:02 | ludovic | Target Version | => 3.0.0 |